2008 Annual Excellent Agricultural Project Award - Shemagan Canal farm pond engineering project

Date :2021-09-22 Issued byTaitung Management Office

Basic information

  • Organizer:
    Taitung Management Office, Irrigation Agency
  • Construction period:
    2008-07-08~2008-12-18
Content

1. Project Background: TTo address the issue of poor water supply in the overlapping irrigation areas of Shemagan Canal and Beinan Upper Canal, a plan has been initiated to improve local irrigation and management.

2. Construction Location: Taitung City, Taitung County.

3. Total Project Cost: NT$8,900,000.

4. Construction Period: From July 8, 2008, to December 18, 2008, with a total duration of 165 calendar days.

5. Project Details: Construction of two new farm ponds, installation of one new pumping well, general improvement of the farm ponds' surrounding environment, and other related works.

農塘曲面邊坡
農塘曲面邊坡
農塘曲面邊坡

Curved slope design for the farm ponds

農塘周邊安全設施─仿木欄杆
農塘周邊安全設施─仿木欄杆
農塘周邊安全設施─仿木欄杆

Installation of safety facilities around the ponds, such as wooden-style railings

運用砌石不填縫的方式創造水中生態環境
運用砌石不填縫的方式創造水中生態環境
運用砌石不填縫的方式創造水中生態環境

Creation of a water-based ecological environment with dry masonry stones

就地取材 -永續、節能、減碳
就地取材 -永續、節能、減碳
就地取材 -永續、節能、減碳

Use of local materials for sustainability, energy savings, and carbon reduction


Innovation, challenges and extendibility of the construction

1. Diversified water supply uses with the construction of a small waterwheel and settling tank to save energy, reduce carbon emissions, and purify water, all while blending with the landscape.

2. Locally sourced stones are used for the edges of the landscape ponds, ensuring environmental sustainability and reducing construction costs.

3. The design and construction of the farm ponds were guided by various reference designs, with methods adjusted through on-site modifications to ensure successful completion.

4. The traffic flow design around the farm ponds was improved, making it more convenient for visitors and facilitating maintenance.

5. Safety infrastructure around the farm ponds is fully planned and gradually implemented.

6. A comprehensive park plan is formulated, with an annual budget to ensure its systematic execution.

7. The project will be connected to various scenic spots in Taitung, creating a tourism network that aligns with the Taitung County Government's initiatives to promote tourism and leisure, thus increasing the added value of the project.

8. Scenic and Ecological Value: The transformation of barren land into a lush, green park teeming with flora and fauna enhances the area's natural beauty. The project utilizes the region's rich ecology and wide-open views, creating a scenic recreational area that blends seamlessly with the surrounding mountains and rivers.


Excellent performance and significant benefits of the construction

1. Comprehensive Park Planning.

2. Desilting channels are installed to reduce maintenance costs and extend the lifespan of the infrastructure.

3. The integration of water systems increases overall efficiency.

4. Use locally sourced materials for sustainability, energy efficiency, and carbon reduction, significantly lowering project costs.

Last Updated:2024-11-07