1. Project Background: TTo address the issue of poor water supply in the overlapping irrigation areas of Shemagan Canal and Beinan Upper Canal, a plan has been initiated to improve local irrigation and management.
2. Construction Location: Taitung City, Taitung County.
3. Total Project Cost: NT$8,900,000.
4. Construction Period: From July 8, 2008, to December 18, 2008, with a total duration of 165 calendar days.
5. Project Details: Construction of two new farm ponds, installation of one new pumping well, general improvement of the farm ponds' surrounding environment, and other related works.



Curved slope design for the farm ponds



Installation of safety facilities around the ponds, such as wooden-style railings



Creation of a water-based ecological environment with dry masonry stones



Use of local materials for sustainability, energy savings, and carbon reduction
1. Diversified water supply uses with the construction of a small waterwheel and settling tank to save energy, reduce carbon emissions, and purify water, all while blending with the landscape.
2. Locally sourced stones are used for the edges of the landscape ponds, ensuring environmental sustainability and reducing construction costs.
3. The design and construction of the farm ponds were guided by various reference designs, with methods adjusted through on-site modifications to ensure successful completion.
4. The traffic flow design around the farm ponds was improved, making it more convenient for visitors and facilitating maintenance.
5. Safety infrastructure around the farm ponds is fully planned and gradually implemented.
6. A comprehensive park plan is formulated, with an annual budget to ensure its systematic execution.
7. The project will be connected to various scenic spots in Taitung, creating a tourism network that aligns with the Taitung County Government's initiatives to promote tourism and leisure, thus increasing the added value of the project.
8. Scenic and Ecological Value: The transformation of barren land into a lush, green park teeming with flora and fauna enhances the area's natural beauty. The project utilizes the region's rich ecology and wide-open views, creating a scenic recreational area that blends seamlessly with the surrounding mountains and rivers.
1. Comprehensive Park Planning.
2. Desilting channels are installed to reduce maintenance costs and extend the lifespan of the infrastructure.
3. The integration of water systems increases overall efficiency.
4. Use locally sourced materials for sustainability, energy efficiency, and carbon reduction, significantly lowering project costs.